Skip to main content

Incident Log

Annex A.8.4 incident record for the unauthorized order-proposal near miss.

IncidentLogISO/IEC 42001:2023v0.1.0draft
Operational AI incidents for the Portfolio Assistant, including the propose-without-approval near miss.

Clauses: A.8.4

entries (1)

inc-propose-without-approvalNear miss — assistant constructed order proposal without approval gate

During a propose-level session the assistant constructed a structured order proposal that was presented as ready for trading-desk handoff without the human approval gate enforcing acknowledgement. The portfolio manager did not approve; no order was submitted. Detected via session-logger alert when proposal_ready was emitted without approval_recorded.

Category
Authority control near miss
Status
Contained
Severity
High